Usage:
1. Clean the base surface before construction, make sure the base surface is dry and clean. If there is cracks (2mm or greater), we recommend you to repair it with a seal ant first, then use a waterproofing agent.
2. Spray or brush product directly on surface such as ceramic tile, floor tile, wall tile cement, etc. Wait for the product to penetrate the base course. After a few minutes, if the surface becomes fluid, spray 2-3 times for better effect. The waterproof layer can be formed after 24-48 hours of hardening, and with time delay, the waterproof layer becomes stronger.